The Problem
The customer, Graham Construction, was working on a retaining wall for a community development project in the city of Edmonton. The wall needed to perform as a separation barrier for the Station Point Subdivision.
The Solution
Our technical sales team interpreted the prints. With over 60,000 feet of cable required, this high-volume project needed the right hardware. The Lifeline threaded turnbuckle allowed for clearance through the intermediate uprights, which had already been pre-drilled.
The Result
Lexco’s team met material specifications and delivered in just four weeks.